Queensland Coal Mines/Sites
267
Hillalong
Bowen
Operator
Cuba Mining Pty Ltd
Principal Holder Cuba Mining Pty Ltd
Phone:
Fax:
Location
20km east of Glenden.
Coal Measures:
Major Beneficial
Owner/s
Main tenements
Geology
Rangal and Fort Cooper Coal Measures of Late Permian age
contained in the southern limb of the Exevale Syncline. Potential
economic resources have been equated with the Hynds Seam in the
Hail Creek area. Dips are 12 to 28 degrees to the northeast. The
Hynds seam ranges from 4.5m to >6.0m along a strike length of 7 km.
Mining Method
Rangal
Transport
Preparation plant
Product Coals
Comments
Proximity to new coal transport infastructure associated with the development of the Hail Creek mine, about 20km, to the south-east,
may improve the project viability and influence the further evaluation of the deposit
Undeveloped
Status:
Deposit
Type:
Related Website
Basin:
Synonyms:
Address
c/- Macarthur Coal Pty Ltd Level 10, 380 Queen St
BRISBANE Qld 4000
Small
Small
Small
Small
Size*:
PO Box 7146
Riverside Centre
Qld 4001
Street
Postal
Fort Cooper
MDL 324
* Sites: Small < 50Mt, Medium 51 to 150Mt, Large 151 to 500Mt, Very Large > 500Mt measured and indicated
Mines: Small < 2Mt, Medium > 2Mt < 10Mt, Large > 5Mt < 10Mt, Very Large > 10Mt annual saleable coal production
Data updated March 2005