Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
LADY CLAYRE
43611
16.4KM WNW OF QUAMBY
Date Recorded:
Descriptive Location:
Grid Reference:
Latitude  -20.3242 Longitude  140.1352
ABANDONED, ACTIVE PROSPECT
AMG Zone 54  409718 mE  7752399 mN
1:100 000 sheet Number and Name: 6957 QUAMBY
6/January/2006
Other Names for Deposit Mine
Roseby Project
Commodities
Size
Size Definition
COPPER
SMALL
500 - 50 000 tonnes CU
GOLD
VERY SMALL
<0.5 tonnes AU
Production Details
21
Period:
31/12/1908
tonnes ore
COPPER
METAL
2.5 tonnes
11.50 percent
503
Period:
1/01/1969
31/12/1969
to
tonnes ore
COPPER
METAL
23.3 tonnes
4.60 percent
SILVER
1.5 kilograms
2.97 grams per tonne
Published Reserves/Resources
INFERRED MINERAL RESOURCE
3600000 tonnes Ore @
BR 7075 Published in 2004
LADY CLAYRE  - ZONE A
FOR
42840 Tonnes COPPER
1.19 % COPPER
FOR
1980 Kilograms GOLD
0.55 g/t GOLD
Comments/Cut Off Factor:
0.5% Cu cutoff grade
INFERRED MINERAL RESOURCE
900000 tonnes Ore @
BR 7075 Published in 2004
LADY CLAYRE - ZONE F
FOR
7740 Tonnes COPPER
0.86 % COPPER
FOR
342 Kilograms GOLD
0.38 g/t GOLD
Comments/Cut Off Factor:
cutoff grade 0.5% copper.
Resource figures listed above are JORC compliant.
Year 
Author
Published Reference  ID
2004
UNIVERSAL RESOURCES LIMITED
BR 7075
UNIVERSAL RESOURCES LIMITED REPORT TO ASX: ROSEBY RESOURCES AND SCOPING STUDY - 9TH FEBRUARY 2004
UNIVERSAL RESOURCES LIMITED
Comments
Year Completed
Year Commenced
Major Mining Related Events 
Mining Operations
Comments
SHAFTS
UNDERGROUND MINING METHODS
PITS
Tenure Type/Number
Company Name/Surname
SHARE
ML
2649
UNIVERSAL RESOURCES LIMITED
50.00%
ML
2649
BOLNISI LOGISTICS PTY LTD
50.00%
Host Rock/Cover Sequences
Structural Unit
Formation Name/Age
WONGA SUBPROVINCE
Coocerina Formation PALAEOPROTEROZOIC to 
PALAEOPROTEROZOIC
Deposit Model
GENERAL ORE BODY MODEL
HYDROTHERMAL VEINS/PIPE/STOCKWORK
DETAILED ORE BODY MODEL
PROTEROZOIC STRUCTURALLY-CONTROLLED 
COPPER-GOLD
Mineralisation Age
ORE
MESOPROTEROZOIC
Comments
A scoping study of mining and treating around 2 MT per year of sulphide copper-gold mineralisation is in progress.
Following drill program results a feasibility study will be carried out.
Web Page
http://www.universalresources.com.au/