A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition |
FAR FANNING
479535
100 KM SOUTH-WEST OF TOWNSVILLE.
Latitude -19.6692 Longitude 146.3714
OPERATING, ACTIVE PROSPECT
AMG Zone 55 434100 mE 7825000 mN
1:100 000 sheet Number and Name: 8158 DOTSWOOD
19/January/2006
Other Names for Deposit / Mine |
GOLD
VERY SMALL
<0.5 tonnes AU
3,756
1/01/1865
31/12/1908
tonnes ore
GOLD
BULLION
79.6 kilograms
360,000
1/07/1986
30/06/1987
tonnes ore
GOLD
FINE
335.9 kilograms
1/07/1999
30/06/2000
GOLD
BULLION
29.5 kilograms
1/07/2000
30/06/2001
GOLD
METAL
176.4 kilograms
SILVER
64.0 kilograms
66,283
1/07/2001
30/06/2002
tonnes ore
GOLD
BULLION
294.6 kilograms
4.25 grams per tonne
74,535
1/07/2002
30/06/2003
tonnes ore
GOLD
BULLION
396.1 kilograms
5.15 grams per tonne
1/07/2004
30/06/2005
GOLD
BULLION
714.0 kilograms
Published Reserves/Resources |
INDICATED MINERAL RESOURCE
44434 tonnes Ore @
BR 7029 Published in 2003
FAR FANNING
376 Kilograms GOLD
8.48 g/t GOLD
Cutoff Grade of 2.0g/t Au
MEASURED MINERAL RESOURCE
35000 tonnes Ore @
BR 7029 Published in 2003
FAR FANNING
70 Kilograms GOLD
2.00 g/t GOLD
Cutoff Grade of 2.0g/t Au.
Resource figures listed above are JORC compliant.
2003
SMC GOLD LIMITED
BR 7029
SMC GOLD LIMITED - QUARTERLY REPORT ON OPERATIONS JULY TO SEPTEMBER 2003
SMC GOLD LIMITED
Major Mining Related Events |
OPEN CUT MINING
Planned to be 50m deep with a strip ratio of 6:1 (waste:ore).
UNDERGROUND MINING METHODS
DECLINED SHAFTS/DRIVES
Spiral decline commenced during the March quarter 2003. |
Decline has accessed ore on two level only before being |
abandoned due to bad ground conditions. |
ML
1349
BUSH OASIS PTY LTD
100.00%
ML
1350
BUSH OASIS PTY LTD
100.00%
ML
1351
BUSH OASIS PTY LTD
100.00%
ML
1437
BUSH OASIS PTY LTD
100.00%
ML
1438
BUSH OASIS PTY LTD
100.00%
Host Rock/Cover Sequences |
BURDEKIN BASIN
Julia Formation / LATE DEVONIAN to LATE DEVONIAN