Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
CAROLINE
486625
15.5 KM WNW OF QUAMBY
Date Recorded:
Descriptive Location:
Grid Reference:
Latitude  -20.3111 Longitude  140.1496
ABANDONED, ACTIVE PROSPECT
AMG Zone 54  411219 mE  7753857 mN
1:100 000 sheet Number and Name: 6957 QUAMBY
6/January/2006
Other Names for Deposit Mine
Gidgy Park
Lady Clayre East
Roseby Project
Commodities
Size
Size Definition
COPPER
SMALL
500 - 50 000 tonnes CU
Production Details
7
tonnes ore
COPPER
UNKNOWN
Published Reserves/Resources
INFERRED MINERAL RESOURCE
4000000 tonnes Ore @
BR 7617 Published in 2004
FOR
32000 Tonnes COPPER
0.80 % COPPER
Comments/Cut Off Factor:
0.5% Cu cutoff.
Resource figures listed above are NOT JORC compliant.
Year 
Author
Published Reference  ID
2004
UNIVERSAL RESOURCES LIMITED
BR 7617
UNIVERSAL RESOURCES LIMITED 2004 ANNUAL REPORT
UNIVERSAL RESOURCES LIMITED
Comments
Year Completed
Year Commenced
Major Mining Related Events 
Mining Operations
Comments
SHAFTS
PITS
Tenure Type/Number
Company Name/Surname
SHARE
ML
2655
UNIVERSAL RESOURCES LIMITED
50.00%
ML
2655
BOLNISI LOGISTICS PTY LTD
50.00%
ML
90055
UNIVERSAL RESOURCES LIMITED
50.00%
ML
90055
BOLNISI LOGISTICS PTY LTD
50.00%
Host Rock/Cover Sequences
Structural Unit
Formation Name/Age
WONGA SUBPROVINCE
Corella Formation PALAEOPROTEROZOIC to 
PALAEOPROTEROZOIC
Deposit Model
GENERAL ORE BODY MODEL
SEDIMENT-HOSTED DEPOSIT
SUPERGENE 
ENRICHED
DETAILED ORE BODY MODEL
PROTEROZOIC STRUCTURALLY-CONTROLLED 
COPPER-GOLD
Mineralisation Age
ORE
MESOPROTEROZOIC
Comments
Little open file information is available on this resource. It forms part of the Roseby Project of Universal Resources Limited.
The oxide ore contains native copper (50 to 70%), copper in clays and micas (30 to 40%), and chalcocite (<10%), and is the result of 
weathering of primary stratabound sulphide deposits containing bornite and chalcopyrite.
Web Page
http://www.universalresources.com.au/