A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition |
JUNCTION
491760
25 KM SOUTH OF MARLBOROUGH, 155KM NW OF GLADSTONE.
Latitude -23.0626 Longitude 149.9473
MINERAL OCCURRENCE, ACTIVE PROSPECT
AMG Zone 55 802000 mE 7446500 mN
1:100 000 sheet Number and Name: 8851 ROOKWOOD
7/December/2005
Other Names for Deposit / Mine |
Marlborough Nickel Project
NICKEL
MEDIUM
25 000 - 500 000 tonnes NI
COBALT
MEDIUM
1 000 - 20 00 tonnes CO
Published Reserves/Resources |
INDICATED MINERAL RESOURCE
2500000 tonnes Ore @
BR 6122 Published in 1999
19250 Tonnes NICKEL
0.77 % NICKEL
1500 Tonnes COBALT
0.06 % COBALT
Ni equivalent cutoff of 0.7% Ni.
MEASURED MINERAL RESOURCE
8900000 tonnes Ore @
BR 6122 Published in 1999
75650 Tonnes NICKEL
0.85 % NICKEL
5340 Tonnes COBALT
0.06 % COBALT
Ni equivalent cutoff of 0.7%.
Resource figures listed above have been extracted from Company Annual reports or published literature.
1999
PRESTON RESOURCES LIMITED
BR 6122
ANNUAL REPORT 1999
PRESTON RESOURCES LIMITED
Major Mining Related Events |
ML
80062
MARLBOROUGH NICKEL PTY LTD
100.00%
Host Rock/Cover Sequences |
MARLBOROUGH BLOCK
Princhester Serpentinite / NEOPROTEROZOIC to EARLY PALAEOZOIC
GENERAL ORE BODY MODEL
RESIDUAL DEPOSIT
DETAILED ORE BODY MODEL
LATERITIC NICKEL
LATERITE
CAINOZOIC
This resource forms part of Marlborough Preston Nickel/Cobalt Project.