Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
ELOISE
494046
157 KM EAST OF MT ISA, 56.4 KM ESE OF CLONCURRY
Date Recorded:
Descriptive Location:
Grid Reference:
Latitude  -20.9547 Longitude  140.9794
OPERATING, ACTIVE PROSPECT
AMG Zone 54  497860 mE  7682850 mN
1:100 000 sheet Number and Name: 7056 CLONCURRY
19/January/2006
Other Names for Deposit Mine
Eloise Deeps - Lode B
Levuka Lode - Lode B
Lode A
40 Lode
42 Lode
45 Lode
Commodities
Size
Size Definition
COPPER
MEDIUM
50 000 - 250 000 tonnes CU
GOLD
SMALL
0.5 - 5 tonnes AU
SILVER
SMALL
5 - 500 tonnes AG
Production Details
38,038
Period:
1/07/1995
30/06/1996
to
tonnes ore
COPPER
METAL
353.3 tonnes
SILVER
380.2 kilograms
GOLD
FINE
14.3 kilograms
345,723
Period:
1/07/1996
30/06/1997
to
tonnes ore
COPPER
METAL
14011.0 tonnes
SILVER
4217.6 kilograms
GOLD
FINE
228.9 kilograms
474,490
Period:
1/07/1997
30/06/1998
to
tonnes ore
COPPER
METAL
20500.0 tonnes
SILVER
5235.5 kilograms
GOLD
FINE
288.7 kilograms
472,450
Period:
1/07/1998
30/06/1999
to
tonnes ore
COPPER
METAL
20291.7 tonnes
SILVER
4799.3 kilograms
GOLD
FINE
406.3 kilograms
519,212
Period:
1/07/1999
30/06/2000
to
tonnes ore
GOLD
METAL
385.8 kilograms
SILVER
5478.2 kilograms
COPPER
METAL
21190.0 tonnes
503,779
Period:
1/07/2000
30/06/2001
to
tonnes ore
COPPER
METAL
18760.0 tonnes
GOLD
METAL
312.8 kilograms
SILVER
5438.1 kilograms
551,590
Period:
1/07/2001
30/06/2002
to
tonnes ore
COPPER
METAL
16173.0 tonnes
GOLD
METAL
266.3 kilograms
Period:
1/07/2002
30/06/2003
to
COPPER
METAL
20265.0 tonnes
SILVER
6463.5 kilograms
GOLD
METAL
292.5 kilograms
Period:
1/07/2003
30/06/2004
to
COPPER
METAL
14825.0 tonnes
SILVER
4729.0 kilograms
GOLD
METAL
185.5 kilograms
Period:
1/07/2004
30/06/2005
to
GOLD
BULLION
173.3 kilograms
COPPER
METAL
20038.8 tonnes
SILVER
3223.0 tonnes