A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition |
GOONDICUM CRATER ILMENITE
496687
GOONDICUM CRATER, 23KM SE OF KALPOWER, 100KM SW OF GLADSTONE.
Latitude -24.8456 Longitude 151.4081
OPERATING, ACTIVE PROSPECT
AMG Zone 56 339143 mE 7251205 mN
1:100 000 sheet Number and Name: 9148 MONTO
19/January/2006
Other Names for Deposit / Mine |
Goondicum
ILMENITE
SMALL
5 000 - 5 000 000 tonnes IM
APATITE
FELDSPAR
LARGE
>100 000 tonnes FS
TITANO-MAGNETITE
LARGE
>1 000 000 tonnes TITMAG
1/07/2004
30/06/2005
APATITE
49.5 tonnes
FELDSPAR
1278.4 tonnes
ILMENITE
301.8 tonnes
Published Reserves/Resources |
INDICATED MINERAL RESOURCE
21334000 tonnes Ore @
BR 7699 Published in 2005
CRATER ELUVIUM
938696 Tonnes ILMENITE
4.40 % ILMENITE
469348 Tonnes MAGNETITE
2.20 % MAGNETITE
MEASURED MINERAL RESOURCE
57678000 tonnes Ore @
BR 7699 Published in 2005
CRATER ELUVIUM
2999256 Tonnes ILMENITE
5.20 % ILMENITE
1788018 Tonnes MAGNETITE
3.10 % MAGNETITE
INDICATED MINERAL RESOURCE
18000000 tonnes Ore @
BR 7019 Published in 2003
ELUVIUM IN BURNETT RIVER
2646000 Tonnes FELDSPAR
14.70 % FELDSPAR
376200 Tonnes APATITE
2.09 % APATITE
INFERRED MINERAL RESOURCE
16600000 tonnes Ore @
BR 7019 Published in 2003
ELUVIUM IN BURNETT RIVER
2041800 Tonnes FELDSPAR
12.30 % FELDSPAR
287180 Tonnes APATITE
1.73 % APATITE
Resource figures listed above are JORC compliant.
2003
MONTO MINERALS NL
BR 7019
MONTO MINERALS ANNUAL REPORT 2003
MONTO MINERALS NL
2005
MONTO MINERALS NL
BR 7699
MONTO MINERALS ANNUAL REPORT 2005
MONTO MINERALS NL
Major Mining Related Events |
Operating Mine Life: 2005 to 2030 Production of ilmenite, feldspar and apatite expected by June 2006. Resource base |
expected to give a 25 year mine life as at June 2005. |
ML
80044
MONTO RESOURCES PTY LTD
100.00%
ML
80075
MONTO RESOURCES PTY LTD
100.00%