Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
YARRAMAN
496707
NORTH EASTERN CORNER OF NORTH STRADBROKE ISLAND, 45KM EAST OF BRISBANE.
Date Recorded:
Descriptive Location:
Grid Reference:
Latitude  -27.4650 Longitude  153.4944
OPERATING, ACTIVE PROSPECT
AMG Zone 56  548854 mE  6961952 mN
1:100 000 sheet Number and Name: 9543 BRISBANE
11/January/2006
Other Names for Deposit Mine
North Stradbroke Island
Commodities
Size
Size Definition
ILMENITE
SMALL
5 000 - 5 000 000 tonnes IM
ZIRCON
SMALL
500 - 500 000 tonnes ZIR
RUTILE
MEDIUM
200 000 - 500 000 tonnes RUT
MONAZITE
SMALL
200 - 20 000 tonnes MZ
Production Details
Period:
1/07/2000
30/06/2001
to
RUTILE
32713.0 tonnes
ZIRCON
22533.0 tonnes
ILMENITE
33995.0 tonnes
Period:
1/07/2001
30/06/2002
to
RUTILE
28193.0 tonnes
ZIRCON
19965.0 tonnes
ILMENITE
58648.0 tonnes
Period:
1/07/2002
30/06/2003
to
RUTILE
18040.0 tonnes
ZIRCON
16272.0 tonnes
ILMENITE
57642.0 tonnes
Period:
1/07/2003
30/06/2004
to
RUTILE
19343.0 tonnes
ZIRCON
16501.0 tonnes
ILMENITE
62537.0 tonnes
Period:
1/07/2004
30/06/2005
to
RUTILE
30461.0 tonnes
ZIRCON
27705.0 tonnes
ILMENITE
83436.0 tonnes
Published Reserves/Resources
MEASURED MINERAL RESOURCE
214100000 tonnes Ore @
BR 7703 Published in 2004
YARRAMAN - DREDGE
FOR
599480 Tonnes ILMENITE
0.28 % ILMENITE
FOR
239792 Tonnes RUTILE
0.11 % RUTILE
FOR
194831 Tonnes ZIRCON
0.09 % ZIRCON
INDICATED MINERAL RESOURCE
600000 tonnes Ore @
BR 7703 Published in 2004
YARRAMAN - DRY MINE
FOR
3354 Tonnes ILMENITE
0.56 % ILMENITE
FOR
1170 Tonnes RUTILE
0.20 % RUTILE
FOR
1014 Tonnes ZIRCON
0.17 % ZIRCON
MEASURED MINERAL RESOURCE
5000000 tonnes Ore @
BR 7703 Published in 2004
YARRAMAN - DRY MINE
FOR
21450 Tonnes ILMENITE
0.43 % ILMENITE
FOR
8250 Tonnes RUTILE
0.17 % RUTILE
FOR
6600 Tonnes ZIRCON
0.13 % ZIRCON
Resource figures listed above are JORC compliant.
Year 
Author
Published Reference  ID
2004
CONSOLIDATED RUTILE LIMITED
BR 7703
CONSOLIDATED RUTILE LIMITED ANNUAL REPORT 2004
CONSOLIDATED RUTILE LIMITED
Comments
Year Completed
Year Commenced
Major Mining Related Events 
Operating Mine Life: 1997 to 2012 Dredge relocated to this mine in 1999 with operations commencing in Sept 1999.
Mining Operations
Comments
DREDGING
Floating dredge with spiral concentrators snaking through high 
dunes.