Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
Published Reserves/Resources
INDICATED MINERAL RESOURCE
341000 tonnes Ore @
BR 7701 Published in 2005
VULCAN
FOR
4092 Tonnes COPPER
1.20 % COPPER
Comments/Cut Off Factor:
0.5% Cu cutoff
INFERRED MINERAL RESOURCE
119000 tonnes Ore @
BR 7701 Published in 2005
VULCAN
FOR
952 Tonnes COPPER
0.80 % COPPER
Comments/Cut Off Factor:
0.5% Cu cutoff
Resource figures listed above are JORC compliant.
Year 
Author
Published Reference  ID
2005
MATRIX METALS LIMITED
BR 7701
MATRIX METALS LIMITED ANNUAL REPORT 2005
MATRIX METALS LIMITED
Comments
Year Completed
Year Commenced
Major Mining Related Events 
Mining Operations
Comments
SHAFTS
OPEN CUT MINING
PITS
TRENCHES
STOPES
UNDERGROUND MINING METHODS
ADITS
Trends 050 degrees.
Tenure Type/Number
Company Name/Surname
SHARE
ML
2519
MATRIX METALS LIMITED
100.00%
Host Rock/Cover Sequences
Structural Unit
Formation Name/Age
QUAMBY-MALBON SUBPROVINCE
Marimo Slate / PALAEOPROTEROZOIC to PALAEOPROTEROZOIC
Deposit Model
GENERAL ORE BODY MODEL
HYDROTHERMAL VEINS/PIPE/STOCKWORK
DETAILED ORE BODY MODEL
IRON-OXIDE CU-U-AU-REE
GENERAL ORE BODY MODEL
HYDROTHERMAL VEINS/PIPE/STOCKWORK
DETAILED ORE BODY MODEL
SHEAR ZONE-HOSTED HYDROTHERMAL
Mineralisation Age
ORE
MESOPROTEROZOIC
Comments
Vulcan forms part of Majestic Resources NL's White Range Project.
Web Page