Queensland Minerals
A Summary of Major Mineral Resources, Mines and Projects, 2nd Edition
Year 
Author
Published Reference  ID
1998
GILLIAN BESTER (EDITOR)
BR 5921
REGISTER OF AUSTRALIAN MINING 1998/99. RESOURCE INFORMATION UNIT.
2002
RIO TINTO LIMITED
BR 7018
RIO TINTO LIMITED ANNUAL REPORT AND FINANCIAL STATEMENTS 2002
RIO TINTO LIMITED
Comments
Year Completed
Year Commenced
Major Mining Related Events 
Operating Mine Life1961 to 2041 First commercial shipment of bauxite made in 1963 with continuous mining since then
major upgrade of the mine was completed in 1998.
Mining Operations
Comments
SURFACE MINING METHODS
OPEN CUT MINING
Tenure Type/Number
Company Name/Surname
SHARE
ML
6024
COMALCO ALUMINIUM LIMITED
100.00%
ML
7024
COMALCO ALUMINIUM LIMITED
100.00%
Host Rock/Cover Sequences
Structural Unit
Formation Name/Age
KARUMBA BASIN
Bulimba Formation / TERTIARY to TERTIARY
Deposit Model
GENERAL ORE BODY MODEL
RESIDUAL DEPOSIT
DETAILED ORE BODY MODEL
LATERITIC BAUXITE
DETAILED ORE BODY MODEL
LATERITIC KAOLIN
Mineralisation Age
BAUXITE
CAINOZOIC
KAOLIN
CAINOZOIC
Comments
Web Page
http://www.comalco.com.au/